On Saturday 2 September 2017 between 9:30 a.m. & 4:00 p.m., Engineering and Facilities unit is planning to carry out maintenance work on Backup Generator set, in event of main power supply failure residential areas and critical loads such as lab and servers will be supplied via secondary Backup Generator set except all office buildings (FOGERA, BEGAIT, WASHERA, HAMMER & all the rest) which will be out of power till 4:00 p.m.
Apology for any inconvenience this might cause.
Engineering and Facilities unit