Engineering / Ethiopia / ILRI / Official

ILRI Addis – After office hours repair of backup power supply system

On Wednesday August 2nd  between 5:00 p.m. & 9:30 p.m., Engineering and Facilities unit is planning to carry out an urgent maintenance work on Backup Generator set, in event of main power supply failure residential areas and critical loads such as lab and servers will be supplied via secondary Backup Generator set except all office buildings (FOGERA, BEGAIT, WASHERA, HAMMER & all the rest) which will be out of power till 9:30 p.m.

Apology for any inconvenience this might cause.

 

Gezachew Yadeta,  Engineering and Facilities unit