- In relation to the fire hydrant construction project, the asphalt road leading to administration and residences is planned to be blocked from November 12 to 14, 2016. During these period the one way road next to the store /the bank will be operational.
- It is known the big water storage tanker cleaning started last week and it is scheduled to be finalized On November 12, 2016.