ILRI Addis E & FU team has planned to conduct preventive maintenance work on backup generator sets on Saturday May 7th 2016 from 9:00 a.m. – 2:00 p.m.

During this time, if the main power is disconnected from EEPCO, the generator wouldn’t be used as a backup power supply.