ILRI Addis Engineering Unit survey schedule

Kindly note that Engineering Unit team will start the annual condition survey of the office buildings as per the schedule below:

  1. Borena                                  1/2/2016
  2. Menze                                   1/2/2016
  3. Afar                                       1/2/2016
  4. Gumuz                                 2/2/2016
  5. Bonga                                   2/2/2016
  6. Driver’s office                     2/2/2016
  7. Horro                                   3/2/2016
  8. Laundry                              3/2/2016
  9. Security                              4/2/2016
  10. Housing reception           4/2/2016
  11. Infocenter                          4/2/2016

Purpose of the survey is to enable the team estimate the repair and maintenance requirements.